We started Hvare to fix the predictability.

Industrial electricity bills in Canada have two problems: they’re rising, and you can’t predict them. Hvare Power Canada exists to fix that: one accountable partner, transparent modelling you can audit, and independent testing of every system before it’s energized.

What makes us different is testing. Too many storage systems are sold on a spreadsheet and switched on without ever being properly characterised. We test every system before it’s energized, so it performs the way the model said it would, and so a project survives technical due diligence.

We’re a new company built on a method, not a track record we don’t yet have. If you’re evaluating a storage project and want a partner whose test regime holds up, that’s the conversation to start.

Hvare (HVAH-reh) is the Avestan word for the sun, the root of the Persian khvar / khorshid. “Power Canada” states the market and the standard: engineered for Canadian grid codes, Canadian climate, and Canadian industry.

Values

  • Test everything
  • Own the outcome
  • Engineer for the worst day
  • Transparent by default
  • Build for the long horizon

Who we work with

Built for the people carrying the energy risk.

Industrial operations & facilities leaders

Your demand charges get reported up to the executive. An interconnection delay is blocking a new line. You've been burned once by a contractor who vanished after commissioning.

Infrastructure investors & developers

You need a project that survives technical due diligence: transparent modelling you can audit, and a delivery partner whose test regime holds up.

Utilities & large off-takers

You need delivery on the committed date, with documentation that clears compliance the first time.

Typical sites: food & beverage, metals, plastics, cold storage, data centres, mining support.